Special Collections Patron Alert! Construction Delays on Hull, Baxter and Lumpkin

June 10, 2013 – 11:50 AM

Visitors to the UGA Special Collections Libraries should be aware of potential traffic delays if traveling on Hull Street, Lumpkin Street or Baxter Street to reach the Russell Special Collections Library Building.

Hull Street is closed from Baxter Street and Waddell Street from June 10 through June 14. Patrons accessing the Hull Street Deck to park should access  Hull Street from the north via Waddell Street and let the construction attendant know that they need to park in the deck. 

Below is the original construction alert issued by UGA.

UGA Construction advisory:  Lumpkin and Baxter Streets lane and road closures (Ongoing)

When: May 13, 2013 - June 13, 2013

Details: Lanes of Lumpkin and Baxter Streets adjacent to the Bolton Dining Commons construction site will be closed to traffic at various times during the period May 13 through June 13. Through traffic will be slowed, but will be maintained except for the following planned road closures: The block of Lumpkin Street adjacent to the Bolton site will be closed to all traffic on Sunday, June 2 through 5 a.m. Monday, June 3. The block of Baxter Street adjacent to the Bolton site will be closed to all traffic on Sunday, June 9 through 5 a.m. Monday, June 10. During these closures, motorists must find an alternate route.

Post a Comment